Project Division

Function Overview

The Project Division function can block existing projects according to POS locations, so that algorithmic processing will be performed according to blocks. The input image project must contain a POS location. The output file includes all small pieces of image projects and an image project group (.liaepgroup) file containing block information. The image engineering group can be imported into LiDAR360. During import, all image projects in the group will be loaded into the platform, and image alignment can be performed using the image engineering group file.

Parameter Settings

Input path: Select the image project to be divided.

Block size: Group the image project by how many images per block. The number of images in the block project will be slightly more than this value, which is related to the actual image distribution. The minimum value of this parameter can be set to 50, and the default value of 400 is usually recommended.

Output path: Output the files of the chunked project and image project group to this folder.

results matching ""

    No results matching ""